Tagged: 

Viewing 4 posts
  • #14924
    Pieter Van Stee
    Participant
    Posts: 1
    Threads: 1
    Joined: Sep 2017

      Hi,

      I’m wondering if it’s normal for my assets to be copied so slowly when using the copy and relink option (F5).
      Assuming it’s not that complicated it’s annoying to have to wait for 10-15min to copy and relink 12 assets, most of them are under 600kb, one about 17mb.

      Copy speeds are about 100mb/s (Gbit) so that shouldn’t be the issue.
      Please let me know if there’s anything I can do about this.

      Thank you

    Plugin version: 2.88.20
    3ds Max version: 2017
    Renderer: Vray 4

  • #14925
    Posts: 258
    Threads: 1137
    Joined: Aug 2009

      Of course, this is not normal time.

      Vray 4 – this is a Vray Next version?

      Please generate the bug report (menu “Project Manager” ==>> Create support Request)

      and also please send one from files with this problem to support@3d-kstudio.com

      Thanks for feedback.

  • #14928
    Pieter Van Stee
    Participant
    Posts: 1
    Threads: 1
    Joined: Sep 2017

      Hi Alexander,

      Thank you for your reply, I’ll generate the bug report in the next few days.
      It’s Vray Next indeed, but I’ve had this issue with the previous versions of vray as well.
      Looks like an asset (regular jpg with about 500kb in size) is transfered each 2-4min.

      I hope you can determine more with the log file, which I’ll get to you later.
      tx

  • #14929
    Posts: 258
    Threads: 1137
    Joined: Aug 2009

      Please try the latest version of Project Manager – v2.88.42.

      Now it’s available only on dashboard https://3d-kstudio.com/my-account/downloads

      I was little bit speed-up the relink for the “Copy to…” option (F5).

      I hope this update solve a bug that you described.

Viewing 4 posts

You must be logged in to reply to this topic.