Рейтинг@Mail.ru

Project Manager is finally released! | Forum

Please consider registering
guest

Log In

Login form protected by Login LockDown.


Lost password?
Advanced Search:

— Forum Scope —



— Match —



— Forum Options —




Wildcard usage:
*  matches any number of characters    %  matches exactly one character

Minimum search word length is 4 characters - maximum search word length is 84 characters

Topic RSS
Project Manager is finally released!
Read the original blog post
December 1, 2010
16:49
Alex
Admin
Forum Posts: 83
Member Since:
August 11, 2009
Offline

Project Manager v.1.10.22

NEW FEATURES

    Interface

  • Speed up starting the utility.
  • Adds the ability to hide all panels with the F11 key.
  • Interactive updating of contents of a folder at change of the text of the filter.
  • The replacement settings of objects are requested in dialogue immediately before the replacement.
  • More informative messages about the operations on files and folders.
  • More informative text in the status bar .
  • Some design changes.

    Cataloguing. Standard features of Windows Explorer

  • Adds the virtual folder Favorities to store links to files and folders.
  • Adds the ability to copy the textures with the model files and materials.*
  • Standard features Windows Explorer at work with files and folders.
  • Files and folders can now copy, rename and delete.
  • Standard Windows dialogs for working with files and folders.
  • Adds support to Drag&Drop at work with files and folders.
  • Interactive update the contents of the folder when adding, deleting files.
  • Speed up loading folders tree in navigation panel.
  • Standard menu of Windows Explorer with Shift-key (Special thanks to ** you don't have permission to see this link **)

    Thumbnails

  • Render Thumnail now works in the menu.
  • Possibility of caching images of standard formats, regardless of 3ds Max now supported for "Explorer" tab.**
  • Adds the ability to save model to library with viewport screenshot.

    Asset Files

  • Adds the ability to translate path to local or network, including the output files.

*Models should be previously added to the database using the Project Manager
**For example, if a folder contains images of very large size, the user can exit the folder and going back there again some time later.
He sees that the images are loaded immediately!

[youtube ** you don't have permission to see this link **

** you don't have permission to see this link **

"Materials" Category menu

"Models" Category menu

"Tools" menu for "Asset Files" tab

Forum Timezone: UTC 2

Most Users Ever Online: 33

Currently Online:
6 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

Member Stats:

Guest Posters: 22

Members: 1

Moderators: 0

Admins: 1

Forum Stats:

Groups: 6

Forums: 17

Topics: 48

Posts: 116

Newest Members: Track, Alex

Moderators:

Administrators: Alex (83)